Contact us
Tell us about your tapeout
Share the node, the schedule and where it hurts. An engineer will read it, not a sales queue.
Variability and IR budgets get tight at these nodes. Send your PDK details and signoff corners and we will start with a power-grid and POCV review.
- Where the design stands today: RTL, netlist or post-route
- Target frequency and power budget
- PDK and foundry, if you can share them
- Your tapeout date
What happens next
From your message to a gated plan
An engineer reads it
Your message goes to an engineer who has worked in the flow you describe, not into a sales queue.
We scope the problem
A short conversation on your node, schedule and where the design stands: RTL, netlist or post-route.
You get a plan with gates
We propose what to take on, in which order, and what a pass looks like at each gate.

Before you write
What should I send first?
The process node, where the design stands today (RTL, netlist or post-route), your target frequency and power budget, and your tapeout date. PDK and foundry details help if you can share them.
Do I need to share my PDK or design data up front?
No. Start with the node, schedule and the problem. Design data comes later, once the scope is agreed.
Can I hire you for one stage only?
Yes. Timing signoff, EM / IR, physical verification, DFT and verification can each be scoped on their own.