Contact us

Tell us about your tapeout

Share the node, the schedule and where it hurts. An engineer will read it, not a sales queue.

2nm / 3nm GAAFET

Variability and IR budgets get tight at these nodes. Send your PDK details and signoff corners and we will start with a power-grid and POCV review.

  • Where the design stands today: RTL, netlist or post-route
  • Target frequency and power budget
  • PDK and foundry, if you can share them
  • Your tapeout date
Your email app should open with this filled in. If it doesn't, send the details to hr@pratmos.com.

What happens next

From your message to a gated plan

  1. An engineer reads it

    Your message goes to an engineer who has worked in the flow you describe, not into a sales queue.

  2. We scope the problem

    A short conversation on your node, schedule and where the design stands: RTL, netlist or post-route.

  3. You get a plan with gates

    We propose what to take on, in which order, and what a pass looks like at each gate.

Standard-cell layout with poly, metal 1, metal 2 and vias, and a highlighted M2 minimum-spacing DRC violation
Tell us where it hurts: a spacing violation, a failing corner, a hot spot in the IR map.

Before you write

What should I send first?

The process node, where the design stands today (RTL, netlist or post-route), your target frequency and power budget, and your tapeout date. PDK and foundry details help if you can share them.

Do I need to share my PDK or design data up front?

No. Start with the node, schedule and the problem. Design data comes later, once the scope is agreed.

Can I hire you for one stage only?

Yes. Timing signoff, EM / IR, physical verification, DFT and verification can each be scoped on their own.